Lanarkshire Aseptic Preparation Suite

Scope of Works

    • Fully vinyled rooms. Wall, floor and ceilings.
    • Air handling unit complete with insulated supply and extract ductwork.
    • Cabinet extract system.
    • Building Management Control System
    • Steam heating pipework to AHU Coils from hospital supply.
    • Chilled water cooling to AHU Coils from hospital supply.
    • Interlocking pass through hatches complete with alcohol extraction.
    • Air-lock complete with interlocking access-controlled doors.
    • Step-over barrier, fixed and mobile furniture.
    • Intercom system.
    • CCTV system.
    • Electrical installation from hospital supplies.
    • Lighting and emergency lighting installation.
    • Extension of the existing addressable smoke and fire detection system.
    • Data Installation to local patch panel.

Atlas Environments were appointed as the specialist subcontractor and designers for the refurbishment of the existing area to provide a fully validated EU GMP Aseptic manufacturing clean room suite comprising Isolator rooms, inner support area, outer support area, air-locks, office and write up space.