University Laboratory Manchester
Scope of Works
-
- Vinyl faced partitioning system, floor coverings and false ceilings.
- Bench mounted VAV fume cupboards complete with uPVC extract system.
- Laboratory benching and furniture.
- VAV Air handling unit complete with insulated uPVC supply and extract ductwork
- Domestic hot and cold-water services from university supplies.
- Corrosion resistant drainage system.
- Electrical installation from university supplies.
- Lighting and emergency lighting installation.
- Addressable smoke and fire detection system.
- Lighting and emergency lighting installation.
- Addressable smoke and fire detection system modification.
- Sprinkler fire suppression system modification.
Atlas Environments were appointed as the specialist subcontractor for a new ISO Class 7 cosmochemistry laboratory / clean room. The laboratories needed to be constructed to minimise the amount of metals within the room wherever possible.