University Laboratory Manchester

Scope of Works

    • Vinyl faced partitioning system, floor coverings and false ceilings.
    • Bench mounted VAV fume cupboards complete with uPVC extract system.
    • Laboratory benching and furniture.
    • VAV Air handling unit complete with insulated uPVC supply and extract ductwork
    • Domestic hot and cold-water services from university supplies.
    • Corrosion resistant drainage system.
    • Electrical installation from university supplies.
    • Lighting and emergency lighting installation.
    • Addressable smoke and fire detection system.
    • Lighting and emergency lighting installation.
    • Addressable smoke and fire detection system modification.
    • Sprinkler fire suppression system modification.

Atlas Environments were appointed as the specialist subcontractor for a new ISO Class 7 cosmochemistry laboratory / clean room. The laboratories needed to be constructed to minimise the amount of metals within the room wherever possible.